This is the answer to the question Do the interior walls need to be plastered first before screeding the underfloor heating?
Revision 1
2022‑05‑04 05:59
Active REV1
Initial text
Typical design: first the wall is plastered, then strips of insulation are glued to the outside, and finally the screed. The wall and screed should not touch each other for soundproofing reasons. If you plaster after that, you can't plaster up to the screed, but leave a gap. You will get the least satisfaction if you have to remove the plaster residue from the screed again.