Revisions log for Answer #2757
This is the answer to the question Can I lay tiles on a fresh screed?
Revision 1
2022‑10‑11 12:59
Active REV1
Initial text
It doesn't have to dry for 6 weeks, it has to dry for x weeks and then the residual moisture is measured. Each room should have a small hole in the middle with a plastic wand, that's where you take the measurements.
There are additives that make the screed dry faster (very fast).