Initial text

Above our garage, a lintel 7 meters long and 1 meter high was formed and poured. Now the builders must have miscalculated the amount of concrete. This means that the concrete is still missing about 1m long and about 20cm deep. This will definitely be poured today. Now the question. Since the concrete that has already been poured has dried out before today, is it possible that the concrete that will be added today will not "bond" with the concrete that has already been poured? I would like to know if there are any problems with load-bearing capacity, deflection and strength? Or is none of that a problem. 

2022‑06‑11 21:43
AnnoyinglyTired
Active REV1
Initial tags
  • concrete
2022‑06‑11 21:43
AnnoyinglyTired
Active REV1
Initial files
628
628_1
Log in Join
Privacy Policy・Terms of Service