How long after the screed can be laid tiles on the walls?
Revision 1
2022‑04‑10 00:50
Active REV1
Initial title
How long after the screed can be laid tiles on the walls?
2022‑04‑10 00:50
Active REV1
Initial text
Next week our house will be screeded (current screed is anhydrite). When can we start tiling the walls in the bathroom and toilet? Basically, I don't have to wait for the right residual moisture in the screed, do I? Can't I start in 4 weeks, when most of the moisture is out of the screed, and then go straight to the floor tiles, or am I making a mistake?
We have gypsum plaster in the toilet and lime-cement plaster in the bathroom.