When to pour a screed floor?

Asked 9 months ago.
Active 9 months ago.
Viewed 528 times.
  • cement floor
  • screed
0

In the apartment was poured cement screed. It has been drying for 3 days. Can I pour a screed floor? Or do you have to wait longer?

asked 9 months ago
Author avatar
62Rafikkhan Ubayd Allah
Author avatar

Answer

0

It all depends on what you have: screed, sand or polymer. The first dries 28 days, the second 5 days.

If the screed is sandy and more than 50 mm, it is better to wait 10 days.

answered 9 months ago
Author avatar
482dg
Author avatar
Answer this question

Related

  • What to seal the screed measurement site with? And is it necessary?
  • How to deal with the stains on a cement-based leveling floor?
  • Can I open the windows while the screed is drying?
  • How to level the floor on a cracked screed?
  • What to do if the screed is crumbling?
  • What to do with a hole in the screed (8 mm wide, about 8 mm deep) in the top layer of the screed?
  • How to level the floor, if the screed is sloped?
Log in Join
Privacy Policy・Terms of Service